OZG Global Trading House

Turkey → Europe

Sourcing from Turkey

Verified Turkish manufacturers, faster routes to Europe and coordinated sourcing from enquiry to shipment.

3-5 days

by sea from Turkey to EU ports

30-40 days

the same journey from Far East Asia

A.TR

movement certificate simplifying EU entry under the Customs Union

CE · REACH

EU norms many Turkish manufacturers already work to

Why Turkey

The alternative next door

Not a replacement for Asia, but a faster, lower-risk lane alongside it.

Speed

3-5 days by sea to EU ports, versus 30-40 from Asia. React to demand, not forecasts.

Customs Union

Simpler paperwork and more predictable landed cost for industrial goods. Scope is confirmed per product and documentation.

EU-aligned standards

You are matched with manufacturers working to CE, REACH and EU quality norms. Compliance is verified per product.

Flexible volumes

Lower minimums and faster sampling than Far East suppliers. Test small, scale fast.

Istanbul skyline
NEARSHORING

Why European buyers are looking at Turkey now

Long lead times, freight volatility and compliance overhead have made far-shore supply chains expensive to manage. Turkey offers manufacturing depth across textiles, furniture, plastics and metalwork, two truck days from Central Europe.

We verify the factory, audit the production and coordinate inspections and shipment, so nearshoring doesn’t mean starting from zero with unknown suppliers.

Sectors

Where Turkey is strong

Textiles & Apparel
Home & Glassware
Packaging Materials
Plastic Raw Materials · PP, PE and PET granules
Industrial Kitchen Equipment
Hand Tools & Hardware
Equipment and Spare Parts

Different product? Tell us what you need.

Process

Four steps to your warehouse

01

Request

Share your specification; we shortlist suitable, verified manufacturers.

02

Sample & Audit

Samples are verified and the production facility is audited on site.

03

Shipment

The approved batch is consolidated and dispatched to your port.

04

Delivery

Shipment paperwork is planned in advance; delivery is coordinated under the Customs Union framework.

FAQ

Frequently asked questions

It depends on the category and manufacturer; with consolidation, below-container volumes are workable too. Send your specification and we’ll give you a concrete number.

Staged: a partial payment on order confirmation, the balance after the pre-shipment inspection. No full payment is ever made for uninspected goods.

A typical flow, including sampling, production and sea freight, runs 4-8 weeks, with transit to EU ports taking only 3-5 days. We share a clear schedule with your quote.

Test Turkey on your next order.

Send your product, quantity and target price; we’ll come back with a concrete proposal after review.

Scroll to Top